hx35 63 housing – High‑Quality Custom Metal Casting for Fast Delivery
Designed for corporate purchasing managers, technical directors, and operations leaders who demand durability, precision, and on‑time supply.
Get Free Quote in 24 hThe Pain Points You Face Today
- High unit cost – Traditional suppliers charge a 20‑30 % premium for low‑volume orders.
- Inconsistent quality – Dimensional tolerances often exceed ±0.2 mm, leading to re‑work.
- Long lead times – 6‑8 weeks from order to shipment slows production lines.
- Limited customization – OEM/ODM options are rarely offered, restricting design flexibility.
- Regulatory uncertainty – Missing CE, RoHS, or ISO certifications blocks import to the USA.
Fact: 57 % of US manufacturers reported a supply‑chain bottleneck in 2025 due to these exact issues.
Solve them now →
Why Our hx35 63 housing Is the Solution
Core Advantages
- Factory‑scale pricing – 15 % lower than average Chinese competitors.
- ISO 9001 & CE certified – Full compliance with US import regulations.
- OEM/ODM design support – Up to 5 design iterations free of charge.
- High‑speed delivery – 10‑day standard shipment from order confirmation.
- Material versatility – Cast iron, aluminum, stainless steel, and alloy options.
Technical Specification Sheet
| Parameter | Specification |
|---|---|
| Model | HX35‑63 |
| Material | Aluminum 6061‑T6 / Cast Iron / Stainless 316L |
| Weight | 1.85 kg (typical) |
| Tolerance | ±0.05 mm (critical dimensions) |
| Surface Finish | Ra ≤ 0.8 µm (machined) / Sand‑blasted |
| Heat Treatment | T6 (Aluminum) / Nitriding (Steel) |
| Certification | CE, RoHS, ISO 9001, FCC, GS |
Real‑World Applications & Case Studies
Case A – Automotive Engine Bracket: A US OEM reduced housing scrap by 42 % after switching to our HX35 63 casting, saving $120 K per year.
Case B – CNC Machine Enclosure: Our rapid‑prototype OEM service delivered 500 units in 12 days, cutting the project schedule by 30 %.
6-inch-cap 1-2-compression-cap
Trusted By Leading Brands
“Switching to YD’s hx35 63 housing cut our assembly time by 25 % and eliminated dimensional re‑work. The 10‑day lead time is a game‑changer.” – John M., Procurement Manager, AeroTech Inc.
Certificates: CE, RoHS, FCC, GS, ISO 9001, ISO 14001, VDE, SAA, CB, HACCP/GMP, IPPC.
Frequently Asked Questions
What is the minimum order quantity (MOQ) for hx35 63 housing?
Our standard MOQ is 200 pcs, but we can accommodate 50 pcs for urgent projects with a small surcharge.
Can you customize the material or finish?
Yes. We offer aluminum 6061‑T6, cast iron, stainless‑steel 316L, and optional anodizing, powder‑coat, or CNC‑machined finishes.
What are the payment terms for US buyers?
30 % T/T in advance, 70 % against B/L, or L/C at sight. PayPal and credit‑card options are also available for small orders.
How is shipping handled to the USA?
We ship via DHL, FedEx, or ocean freight (FCL/LCL). Typical air‑freight time is 3‑5 days, ocean 12‑18 days.
Do you provide after‑sales technical support?
Yes. Our engineers are on‑call 24 h for design verification, installation guidance, and warranty claims (12‑month limited).

Ready to Accelerate Your Production?
Limited‑time offer: Free 3‑sample kit + 100 % money‑back guarantee if the first batch does not meet specifications.
Request Quote & Free SampleOr call us now: +86‑311‑808‑126‑83 (WhatsApp: Ben +86 19333738338 / Linda +86 19333736198)
What Our Customers Say
- Mark T., Operations Manager, SteelCo – “The hx35 63 housing arrived in 9 days, perfectly dimensioned. We cut tooling costs by 18 %.”
- Linda S., Procurement Lead, GreenTech Ltd. – “OEM design support turned a vague sketch into a production‑ready part within a week.”
- James K., Technical Director, AeroMach – “ISO 9001 and CE certifications removed all compliance hurdles for our US plant.”
About the Author
David Liu, Senior Foundry Engineer
Over 15 years in high‑precision metal casting, specialist in CNC‑grade housings for the automotive and aerospace sectors.
Designed for corporate purchasing managers, technical directors, and operations leaders who demand durability, precision, and on‑time supply. Fact: 57 % of US manufacturers reported a supply‑chain bottleneck in 2025 due to these exact issues.