Mobile:+86-311-808-126-83
Email:info@ydcastings.com
English
The Automobile Water Pump shell may look simple, but anyone who’s torn down a cooling loop knows the housing is the quiet hero. I’ve walked more foundry floors than I can count, and, to be honest, the best ones obsess over porosity, flatness, and sealing faces more than shiny marketing. This particular product—Automobile water pump shell—comes from No.563 Xinhua Road, Shijiazhuang City, Hebei Province, P.R. China. 050051, and it shows those habits in the details.
Two currents shape today’s Automobile Water Pump housings: the shift to compact turbo engines with hotter under-hood temps, and EVs using high-efficiency e-pumps (still need robust aluminum shells). Many customers say durability beats gram shaving—yet lightweight ADC-12/A380 die castings remain the sweet spot for strength vs. cost. Surprisingly, even premium OEMs still specify pressure-impregnation for belt-and-suspenders sealing on critical variants.
| Product name | Automobile water pump shell |
| Material | ADC-12, A380 aluminum alloy (ASTM B85) |
| Process | High pressure die casting (HPDC), CNC machining, optional impregnation |
| Weight | ≈ 0.2–1.5 kg (real-world use may vary by model) |
| Dimensional tolerance | ISO 8062-3 CT7–CT8 typical; GD&T per drawing |
| Surface finish | Ra ≈ 3.2–6.3 μm as-cast/shot-blast; sealing faces milled |
| Leak test | 0.2–0.3 MPa for 60–120 s; leak rate < 0.5 cm³/min typical |
| Service life | Designed for 150k–200k km duty cycles |
Passenger cars, light trucks, and increasingly EV thermal loops. Mining and ag OEMs spec thicker walls for dusty, high-vibration duty. For e-pumps, the Automobile Water Pump housing needs tighter concentricity around motor stators—CMM files help prove it.
| Vendor | Certs | PPAP | Lead time | Notes |
|---|---|---|---|---|
| YD Castings (origin: Shijiazhuang) | IATF 16949, ISO 9001 | Yes (AIAG), IMDS | ≈ 30–45 days | X-ray/CT on request; stable leak rates |
| Generic die caster A | ISO 9001 only | Limited | ≈ 45–60 days | Lower price, higher porosity risk |
| Import broker | Varies | Varies | ≈ 60+ days | Middleman; limited traceability |
Case study: A mid-size SUV program cut scrap from 6% to 1.2% after gate redesign and vacuum die casting; leak failures dropped below 300 ppm over three quarters. Not flashy, just measured improvement—exactly what a Automobile Water Pump housing needs.
Testing data? Typical leak test at 0.25 MPa passes >99.7%; salt spray to 120–240 h per ISO 9227 with proper coating; dimensional Cpk ≥ 1.33 on sealing flatness targets.
Certs? IATF 16949, ISO 9001; RoHS-compliant finishes. PPAP and IMDS available.
Lead-time? Tooling ≈ 4–6 weeks; SOP ramp depends on PPAP gates and volume.
References
Top